Course:

ANGELUS 60L CLOSING MACHINE

Hands-on training to enhance their skills and knowledge of the Angelus 60L Closing Machine.

SCHEDULE

SILGAN Equipment Center

5701 Frontier Rd., Oconomowoc, WI 53066

THREE - FIVE DAYS CLASS *
*Length of course depends on instructor. All content will be covered anywhere in-between three or five days
June 11 - 12, 2019
October 21 – 25, 2019
November 11 – 15, 2019
December 9 – 13, 2019
For custom dates and/or training on location, please email 
SilganU-CES@silgancontainers.com

Who Should Attend

Supervisors and Mechanics who have already taken the “Timing and Adjustments” class or have working knowledge of equipment.

ABOUT THIS CLASS

  • The class is intended to provide hand-on training to enhance skills and knowledge of the Angelus model 60L series machine.
  • Training for other models of seamers are done by request and available seamers (Customer supplied).
  • Each student has a opportunity for hands-on training in the removal and re-assembly of components on the seamer (change parts, seaming spindles, lower lifters, separator assembly, etc.).
  • Students are instructed on the use of manuals for the specific seamer model.

Class Content

DAY 1

  • Removal of Closing Machine Parts
  • Seaming Spindle assembly
  • Re-install seaming spindles
  • Install 2nd Operation seaming cam
  • Install knockout rods

DAY 2

  • Remove and Install Center Mold Casting
  • Install Bell Cover Guides and Bell Cover
  • Disassemble all non-driven lower lifters
  • Assemble all lower lifters
  • Install one non-driven lower lifter
  • Install remain non-driven lower lifter units
  • Set lower lifter spring pressure
  • Set drop from feed table to lower lifter
  • Sweep lower lifters with indicator for plane
  • Remove and disassemble all Driven Lower Lifters
  • Set pin gauge height
  • Set up of Cap Feed Bracket to the Seaming Turret

DAY 3

  • Disassemble Seaming Lever Shafts
  • Install Seaming Lever Shafts andSeaming Levers
  • Double Knife Cover Feed
  • Install cover guide rails and check flow of ends through the rails
  • Single Knife Separator

DAY 4

  • Timing of the Equipment
  • Can Centering Cam
  • Discharge/Knockout Cam

Day 5

  • Seaming clutch set-up
  • Preventative maintenance of closing machine
  • Weekly maintenance checks
  • Six month maintenance checks
  • Audit sheets
  • Review

REGISTRATION FORM

Silgan Containers Technology Training

ANGELUS 60L CLOSING MACHINE

  • Separate each name with a comma.

Individual FORM

Silgan Containers Technology Training

ANGELUS 60L CLOSING MACHINE

  • Separate each name with a comma.